PCB Clearance and Approval in Tamil Nadu

The Tamil Nadu Pollution Control Board (TNPCB) is responsible for regulating industries, businesses, and healthcare facilities to ensure compliance with environmental laws and pollution control norms. Any industry or establishment that generates pollutants (air, water, hazardous waste, or biomedical waste) must obtain approvals from TNPCB before commencing operations.

Types of PCB Clearances & Approvals

1. Consent to Establish (CTE)
  •   CTE is the first approval required before setting up an industry, commercial unit, or healthcare facility.
  •   The application is submitted to TNPCB along with details of land, production process, pollution control measures, and environmental impact.
  •   Once approved, construction and installation of machinery can begin.
2. Consent to Operate (CTO)
  •   After obtaining CTE and completing construction, industries must apply for CTO before starting operations.
  •   CTO is granted only if the unit complies with pollution control norms and has installed necessary environmental safeguards (effluent treatment, air pollution control devices, etc.).
  •   CTO is issued for a fixed period and must be renewed periodically.
3. Hazardous Waste Authorization (HWA)
  •   Required for industries generating hazardous waste (e.g., chemicals, solvents, e-waste, etc.).
  •   Industries must have a proper hazardous waste management system, including safe storage, transportation, and disposal through TNPCB-authorized waste handlers.
  •   Periodic compliance reports must be submitted to TNPCB.
4. Biomedical Waste Authorization (BMW)
  •   Mandatory for hospitals, clinics, laboratories, and veterinary facilities handling biomedical waste.
  •   Healthcare units must segregate, store, and dispose of biomedical waste through TNPCB-approved common treatment facilities (CBMWTFs).
  •   Annual compliance reports must be submitted.

Approval Process for TNPCB Clearances

1. Online Application – Submit the required documents and application through the TNPCB
Online Portal (www.tnpcb.gov.in).

2. Site Inspection & Verification – TNPCB officials inspect the premises for environmental
compliance.
3. Approval or Recommendations – If all conditions are met, the clearance is granted. If
deficiencies are found, the applicant must rectify them before approval.
4. Renewal & Monitoring – Industries must renew CTO, HWA, and BMW authorizations
periodically and submit compliance reports.

Key Compliance Requirements

  • Industries must install pollution control equipment (Effluent Treatment Plant, Air Pollution Control Devices, etc.).
  • Unauthorized discharge of pollutants can result in penalties, closure orders, or legal action by TNPCB.
  • Failure to obtain proper approvals before operation can lead to license cancellation.
  • Strict compliance with environmental regulations is required to avoid penalties.

By securing CTE, CTO, HWA, and BMW clearances, industries and businesses in Tamil Nadu can legally operate while ensuring environmental sustainability.