Overview of Environmental Clearance

Environment Clearance (EC) is a mandatory clearance required by all existing and new Projects (Industries & Construction Projects) listed in Environment Impact Assessment (EIA) 2006 Notification. EIA is the process of evaluating any likely environmental impacts of a proposed project or development activity, taking into account the beneficial and adverse impacts on the environment and inter-related socio-economic, cultural and human health factors. EIA aims to predict these environmental impacts at the early stages of project planning and design. It aids the local community and project’s proponent by suggesting ways to reduce these impacts, shape the project to suit the local environment, and present the predictions and options to decision-makers. The MoEF released the EIA Notification 2006 in suppression of the 1994 notification and shifted the responsibility of giving environmental clearance to the state government depending on the size and capacity of the project. It made EC necessary for specific projects like thermal power plants, mining, river valley, infrastructure developments like roads, highways, ports, harbours and airports, and industries like small electroplating or foundry units. Any project related to the above categories can only start working or amending existing projects after obtaining Environment Clearance from the concerned Authority under MOEF&CC.

Need for Environment Impact Assessment

The Environment Protection Rule, 1986, under sub-rule 3 of Rule 5 imposes certain restrictions and prohibitions on new projects or activities and the need for obtaining Environmental Clearance and submission of EIA for the purpose.

  • EIA aims to link artificial projects with objectives of sustainable development. The assessment enables the decision-makers to analyse the effect of developmental activities on the environment well before the project is implemented.
  • EIA also encourages the inclusion of mitigation strategies in development projects by the project proponent through cost-effective measures to eliminate or minimise any adverse impact of such projects.
  • EIA ensures that the influence of humans on the environment is within the capacity of assimilation and regeneration of the local ecosystem.
  • EIA report helps the authority to grant or reject EC applications based on the Environmental, Social and Economic impacts before the beginning of the project.

Categorization of Industries that Need Environmental Clearance

The Environment Clearance process looks into factors affecting nature and humans, like noise and pollution parameters, along with environmental components for Air, Water, Biological and land. A complete list of Industries and projects has been mentioned in EIA notification 2006. All the projects are categorised into two broad categories based on their production or area under EIA Notification 2006, as given below.

  • Category A: All projects under category A require Environment Clearance from Central Authority.
  • Category B: Further Differentiation of B category is done into B1 and B2 Categories by the concerned SEAC. Projects falling in B1 category will require Environment Clearance from the respective State Authority and projects falling under B2 Category will be exempted from submitting the EIA report.

Documents Required for Environment Clearance

The EIA report is compiled according to the TOR identified during the Scoping stage. Documents required for the purpose are:

  • Detailed Project Description (including the name of the project, location, proposed breakup of area, water requirement, waste generation etc.)
  • Site/ Layout plan
  • Proof of installed machinery
  • Proof of Land Ownership
  • ID proof of Signatory
  • Quality test Report (wherever applicable)
  • Proof of mitigation options adopted
  • Proof of Electricity and water connection

Stages in Environmental Clearance

Stage Applicable Category Description Time Frame
Screening Category B Determines if an EIA is required Varies
Scoping Category A & B1 Determines Terms of Reference for EIA Depends on project

Clearance Process for Expansion, Modernization or Change of product mix in existing projects

Applicants needing to modernise or expand existing projects by increasing the production capacity above the previously authorised capacity will also need environmental clearance by applying to the EAC or the concerned SEAC in Form I. Similarly, for increasing the lease area or production capacity of mining projects or the modernisation of an existing unit with an increase in the production capacity beyond the prescribed threshold limit through a change in process and or technology or involving a change in the product mix will be appraised accordingly. All applications will be considered within sixty days. The validity of any Prior Environmental Clearance will depend on the type of project. For instance, the validity of EC will be ten years in the case of River Valley projects, thirty years for mining projects and five years in the case of all other projects and activities.

Post Environmental Clearance Monitoring

  • For category A Projects, a proponent of safety and EC must be done publically in at least 2 local newspapers of the district or state where the project is situated.
  • For category B Projects, a proponent of safety and EC must be done publically by advertising in newspapers.
  • The project management must submit a half-yearly compliance report on the prior environmental clearance terms and conditions stipulated at the time of receiving EC in hard and soft copies to the SEIAA on 1st June and 1st December of each calendar year